az en ru
The first website in Azerbaijan, created in 1995
HomeStructureInstitutes and OrganizationsInstitute of Chemical Problems named after acad. M.F.NagiyevLaboratory № 21 "Сhemistry and technology of iron-ore raw processing"

Phone: (994 12) 5390096
Fax: (994 12) 5108593
E-mail: chem@science.az zalizadeh@mail.ru 
Head of structural unit:

Zaur Islam Alizadeh
Doctor of Chemical Sciences, senior scientific researcher, professor  of International Ecoenergy Academy

Total number of employees:

8

Main area of activity of the structural unit:

Investigation and development of chemistry and technology of complex processing and rational use of the diverse forms of iron and titanium containing ores of the republic and wastes of production with obtaining metallized pellets and iron powders for steel-smelting production and powder metallurgy and passing extraction of the other valuable raw components.

Main scientific achievements of the structural unit:

There have been studied and developed the processes of deep and complex enrichment of Dashkesan iron ores, pelletizing magnetic super concentrates and their direct reduction by natural gas with obtaining metallized pellets and iron powders; complex processing coastal, shelf, scattered and intrusive titanium magnetites with obtaining alongside with iron powder “an artificial rutile”, chromic compounds, γ-Al2O3, V2O5 of higher purity and regeneration of used reagents;  complex enrichment of sulphide-magnetite ores of deep bedding of South-Dashkesen deposit with production of high qualitative magnetite super concentrate (70 % Fe) and copper-cobalt flotation concentrate; obtaining of titanium-magnetite concentrates, their pelletization and reduction, as a result of complex processing of newly opened Ajinohur titanium-magnetic sandstones for getting iron powders and titanium compounds and rational using industrial wastes as well. The conception of development of ferrous metallurgy of Azerbaijan has been developed and affirmed by the government. On the basis of the results obtained on all the stages of rational processing ore and tests on an industrial scale, the project of the complex for production of 1 mln. tons of steel from local raw has been worked out jointly with German metallurgical concern “Ferrostal”.